MEP Design + Build

MEP Design + Build

035 | How to size + schedule high induction diffusers (Equipment Schedule)

MDB's avatar
MDB
Aug 30, 2022
∙ Paid
2
Share

Introduction

In this post, I am going to show you my process for sizing and scheduling high induction diffusers.

Overview

In my experience, the sizing of air terminals is an extremely collaborative effort between the MEP Engineer and the Manufacturer.

The level of information available for MEP Engineers to confidently & independently size air terminals vari…

This post is for paid subscribers

Already a paid subscriber? Sign in
© 2025 MEP Design + Build
Privacy ∙ Terms ∙ Collection notice
Start writingGet the app
Substack is the home for great culture